the system maintained for isolated work


Published


Reading time: 1min – Video: 1min

Maprimerenov ‘remains accessible for isolated work, provided they are mono gestures, while overall renovations are temporarily suspended. This break aims to strengthen the fight against fraud, with a planned return of the full system on September 15.

Isolate the attic of his house or replace his boiler: finally, this work remains eligible for state aid. But on one condition: they must be mono gestures, that is to say only relate to a single type of work. For the French Building Federation, it is already a victory.

On the other hand, global energy renovations are no longer subsidized for the moment. For example, in a house where everything is to be redone, its owner is worried about being able to finance his work. The complete return of the “Maprimerenov” system is scheduled for September 15. According to the government, this two and a half month break aims to strengthen the fight against the fraud that has multiplied.

Watch the entire report in the video above.



Leave a Comment

Your email address will not be published. Required fields are marked *